Industrial & DC
Kohls Distribution Center - San Bernadino, CA
- Building Area = 660,000 S.F.
- Construction Cost = $35 million
- Construction consists of steel joist, wood roof deck & tilt-up wall panels
- High Seismic Zone
Performance Food Group - Springfield, MA
- Building Area = 212,000 S.F.
- Construction Cost = $16.2 million
- Construction consists of steel joist and steel frame structure
- Cold Storage Distribution Center and office space
Proven Direct - Milwaukee, WI
- Building Area = 154,000 S.F.
- Construction Cost = $10.5 million
- Two-story, steel framed structure supported by driven piles
- Composite slab floor system designed to support 250 psf.
- Houses a production facility and office space
US Foodservice - Tampa, FL
- Building Area = 78,000 S.F.
- Construction Cost = $5.1 million
- Construction consists of steel joist and steel frame structure
- Addition to Cold Storage Distribution Center
Yellow Rose Distribution Center - Franklin, WI
- Building Area = 125,940 S.F.
- Construction Cost = $7.2 million
- Construction consists of steel joist & precast concrete wall panels