Industrial & DC

Kohls Distribution Center - San Bernadino, CA

  • Building Area = 660,000 S.F.
  • Construction Cost = $35 million
  • Construction consists of steel joist, wood roof deck & tilt-up wall panels
  • High Seismic Zone

Performance Food Group - Springfield, MA

  • Building Area = 212,000 S.F.
  • Construction Cost = $16.2 million
  • Construction consists of steel joist and steel frame structure
  • Cold Storage Distribution Center and office space

Proven Direct - Milwaukee, WI

  • Building Area = 154,000 S.F.
  • Construction Cost = $10.5 million
  • Two-story, steel framed structure supported by driven piles
  • Composite slab floor system designed to support 250 psf.
  • Houses a production facility and office space

US Foodservice - Tampa, FL

  • Building Area = 78,000 S.F.
  • Construction Cost = $5.1 million
  • Construction consists of steel joist and steel frame structure
  • Addition to Cold Storage Distribution Center

Yellow Rose Distribution Center - Franklin, WI

  • Building Area = 125,940 S.F.
  • Construction Cost = $7.2 million
  • Construction consists of steel joist & precast concrete wall panels