Other
Lake Valley Camp – Boscobel, WI
- Design of six buildings
- Construction Cost = $6.5 million
- Glue-laminated timber construction
Crate & Barrel Homestore – Wauwatosa, WI
- Steel connection & canopy design
- Design of semirigid beam connections
- Design of canopy connections
Northeast Wisconsin Technical College – Green Bay, WI
- Building rehabilitation for six campus buildings
- Estimated construction cost = $3.0 million
- Fiber reinforced polymer [FRP]
- Both glass & carbon fiber reinforcing to repair dapped end prestressed precast inverted T-beams and prestressed precast double tee’s
- Epoxy injection to repair cracks
Tundra Lodge Hotel & Water Park – Green Bay, WI
- Total Building Area = 155,000 S.F.
- Construction Cost = $14.0 million
- 25,000 S.F. water park with glue-laminated framing
- 130,000 S.F. three story wood framed hotel